Skip to content

The Leaf at Assiniboine Park

Location
Winnipeg, Manitoba

Client
Assiniboine Park Conservancy, with Corbett Architecture

Architects
KPMB as Design Architect in association with Architecture49

Completion
2022

Size
84,400 ft² / 7,840 m²

Project Type
Cultural

Sustainability
LEED® Gold Target

KPMB Team
Mitchell Hall (principal), Glenn MacMullin (senior associate), Angela Lim (associate), Robert McKaye, Lukas Bergmark, Elizabeth Paden, Richard Mui, Victoria Ngai, Victor Garzon

Architecture49 Team
Lee McCormick, Sarah Chernis, Michael Conway, Vizmark Evangelista, Philip Harms, Curtis Rehberg, Wayne Brewer, Darren Wigley, Ron Martin

Consultants
Blackwell (structural), Integral Group (mechanical), SMS Engineering (electrical), HTFC Planning & Design (landscape), KPMB Architects and Architecture49 (interiors), Bird Construction (contractor), Transsolar Inc. (energy & climate), Vector Foiltec (ETFE systems), KGS Group (civil), Soberman Engineering (vertical transportation), LRI Engineering (code), Mulvey & Banani International Inc. (lighting), Lord Cultural Resources (interpretation and visitor experience), DEW Inc. (water feature design), Aercoustics Engineering Ltd (acoustics), Altus (quantity surveyor)

Photography
Tom Arban, Ema Peter, Richard Seck

Press
Maclean’s, April 2024
Canadian Architect, February 2024
AZURE, December 2023
the design story, November 2023
Facades+ Canada, November 2023
Metropolis, November 2023
The Architect’s Newspaper, November 2023
Canadian Architect, October 2023
Architectural Record, October 2023
Conde Nast Traveler Spain, October 2023
Hypebeast, September 2023
Dezeen, September 2023
Designboom, September 2023
Monocle, August 2023
Wallpaper*, August 2023
The Free Press, November 2022
Lord Cultural Resource, June 2020
The Globe and Mail, May 2018